1/05/08
Tear down begins at Tony's Rod Shop. Thanks Tony!
Pharaohs Trailer Project
Last year it was decided that the club needed a means of transporting equipment and other items to events so that Rods could be used instead of boring daily driver pickups.
So, in typical Pharaohs fashion, no normal trailer would do. Mike W. stepped up to the plate and offered his 1960 Chevy as a donor and made the club an offer we could't refuse.
Now, before you purists faint, the Chevy was well on it's way to being the sacrificial lamb to the rust gods, we would never have cut up a usable cruiser! This car is currently being transformed into, what I'm sure will become a local celebrity, so the Pharaohs will save a little piece of history after all. Parts not needed for the trailer build will find their way to gear heads all over the world by way of eBay, this will help finance the project. The 283 and steering wheel are already slated for a traditionally built Ford coupe.
1/12/08 & 1/19/08
Final tear down continues at Bud's place of work.
Thanks Bud!
Sled trying to locate some wheels
Bud "Chop it" and Sled preparing the dead power plant for removal.
Bud and Tony P. thrashing.
The Chevy all blown apart and ready for the fabbin' to begin
New frame rails being created.
Stay tuned...more to come!
"Chop It" torchin' some steel
Sled redrilling the spring mounts to lower the trailer
Tony P. doin' some grinding
Starting to take shape!